|
Installation project of mechanical and electrical equipment in the high-power diesel engine workshopThe project is located in the Industrial Park of Luoyang City, with a construction area of approximately 54473 square meters and a maximum steel structure span of 27 meters. The company is mainly responsible for the installation work of water supply and drainage, HVAC, power supply, lighting, conduit, cable trays, etc. |