Kuwait KNPC Clean Fuel Project

The project is located in Kuwait and involves the installation of 900 tons steel structure and approximately 100000 inches piping   for Units 61 and 144. The total length of the piping is 50000 meters, with a maximum diameter of 36 inches and a minimum of 1.5 inches, accounting for the majority of 8 inches. The project has won the "Excellent Welding Engineering Award".

04 科威特KNPC清洁燃油项目管道安装及附属设施工程.jpg


China Machinery Engineering & Construction Corporation
Web Site:http://www.cmmec.com.cn/
Tel:+86-371-67526441/67529636
Email: cmiicm_mar@163.com
ADD:9#North Rantun Road,Zhengzhou,Henan,P.R. China